karen@brightsparkelectrician.co.uk

01892 531 728

kitchen dining room

Where Bright Ideas

Come to Life!

Scheduling the works for a new Kitchen - All trades including the electricians

Planning and executing a new kitchen installation is a complex process that involves multiple trades, careful scheduling, and attention to detail to ensure a successful outcome. As a homeowner, understanding the typical sequence of works, the roles of different professionals, and the coordination required can make the renovation smoother and more predictable. This comprehensive guide aims to provide a formal, informative overview of the schedule of works for a typical kitchen installation, with helpful tips to ensure your project proceeds efficiently and to the highest standards.

  1. Initial Planning and Design

Before any physical work begins, the first step involves designing your new kitchen. This process includes:

  • Design Development:Consult with kitchen designers or use software to create a layout that meets your needs, preferences, and budget.

    . Typical Mock up
  • Order Placement:Once the design is finalized, place orders for your kitchen units, appliances, worktops, and other accessories. It’s advisable to allow lead times for delivery, especially for bespoke or imported items.
  1. Engaging the Tradespeople

Following your design approval and order confirmation, contact essential tradespeople—electricians, plumbers, gas engineers, plasterers, flooring specialists, and carpenters.

  • Quotation and Scheduling:Each trade will provide a quotation based on the scope of work. Understand that skilled tradespeople often have busy schedules, and their availability might depend on their current workload. Sometimes, they may suggest an approximate start date or suggest a delay due to prior commitments.
  • Choosing the Right Professionals:Be cautious if tradespeople can start at short notice (e.g., the next day), as this can sometimes indicate less experience or unqualified status. Prioritize qualified, experienced professionals to ensure safety, compliance, and quality.
  1. Planning for Delivery and Storage of Kitchen Items

Once ordered, your kitchen will be dispatched in sections:

  • Storage Preparation:Arrange a safe, dry space such as your garage or an available room downstairs to store kitchen components temporarily.
  • Staggered Arrival:Kitchen units, worktops, appliances, and accessories may arrive at different times. Organize these items in a logical order—carcasses towards the front of storage, with appliances and worktops stored strategically for easy access during installation.
  1. Removal of Existing Kitchen and Preparation
  • Old Kitchen Demolition:Carefully remove the existing kitchen units, appliances, and flooring if necessary. This step often involves disconnecting utilities (water, gas, electricity), which must be performed by licensed professionals.
  • Floor Coverings:If your current floor covering (carpet, tiles, vinyl, etc.) obstructs access or installation, it may need to be removed at this stage.
  1. Utility Disconnections and Re-routing
  • Plumbers and Gas Engineers: Initially, these tradespeople will disconnect and isolate the pipework to prevent leaks and ensure safety during removal and installation.
  • Electrical Re-routing: Your electrician will need to mark and plan new circuits, outlets, and switches for your kitchen. This involves several key steps:
    • Wall and Floor Marking:Mark out positions where units, sockets, switches, and lighting will be installed.
    • Electrical Cabling:Extend or reroute cables from existing wiring, passing cables through walls or floors as needed.
      Cabling at First Fix
  1. Wall and Ceiling Preparation
  • Chasing Walls:Outlets for above-counter appliances and lighting will require chasing into the walls—cutting channels to embed sockets, switches, or wiring.
  • Ceiling work:Installing new circuits for ceiling lighting, downlights, or pendants might involve cutting into ceilings to pass cables, especially when existing ceiling cavities are obstructed. In some cases, the ceiling plasterboard may need removal to facilitate cabling.
  1. Wall and Ceiling Finishing
  • Plastering:Once all electrical works are completed, your plasterer will prepare a smooth finish on walls and ceilings. This step is critical for a polished appearance and requires adequate drying time, typically a couple of days.
  1. Plumbing, Gas, and Additional Preparations
  • Pipework Installation:After plastering, plumbers and gas engineers will connect and install new pipework for water, waste, and gas supplies to your appliances.
  • Painting:Walls and ceilings can be painted or primed during this stage, providing a fresh surface for fittings and décor.
  1. Floor Preparation and Installation
  • Flooring Base:Before installing your new floor covering, the flooring contractor may lay a latex primer or screed to create an even surface.
  • Flooring Installation:Depending on your choice—wood, tile, vinyl—the flooring team will install the new surface and prepare it for the kitchen units.
  1. Kitchen Unit Installation
  • Carcass Fitting:Professional fitters will install the cabinet carcasses—these form the backbone of your kitchen, secured to walls and floors for stability.
  • Outlet and Switch Coverings:Once the units are in place, electricians will install socket plates and switches within the cabinetry, aligning with the previously marked positions.
    Isolators in Cupboard
  1. Fitting of Doors, Appliances, and Worktops
  • Cabinet Doors and Drawers: After the carcasses are securely fixed, the kitchen installers will attach doors, drawers, and associated hardware. This step enhances the visual appeal and functionality of your kitchen.
  • Appliance Connection: Built-in appliances such as ovens, microwaves, and integrated refrigerators will be connected by the installation team. This may involve additional wiring or plumbing depending on the appliance requirements.
  • Worktop Measurement and Fitting: If you have a bespoke worktop, the kitchen company will send in their team to take precise measurements (templating). These templates are used to fabricate the worktops accurately. Once ready, they will be installed, often with careful sealing and finishing to ensure durability.
  1. Wall Tiling and Splashbacks
  • Tiling: If you have chosen tiles or splashbacks above work surfaces, they will be installed after the worktops are in place. Tiling requires precise cutting, grouting, and finishing.
  • Additional Fixtures: Any wall-mounted storage or decorative accessories are added at this stage, completing the aesthetic aspects of your kitchen.
  1. Electrical Finalization and Testing
  • Socket and Outlet Installation: Electricians will return to connect sockets into wall tiles or back boxes installed earlier. This ensures all outlets are usable and conform to safety standards.
  • Final Electrical Checks: All circuits will be tested and commissioned to certify correct operation and safety. This includes testing appliances, sockets, lighting, and switches to ensure compliance with electrical regulations.
  • Installation Certification
  1. Snagging and Final Adjustments
  • Inspection and Touch-Ups: The installation team will conduct a comprehensive review to identify any imperfections or issues (snags). This may include aligning doors, adjusting hinges, sealing gaps, or re-grouting tiles.
  • Client Involvement: During this phase, it’s helpful to be present to point out any concerns or items needing attention. However, avoid micromanaging to allow the tradespeople to work efficiently.
  1. Final Cleaning and Hand-over
  • Cleaning: After all works are completed, a thorough clean-up will be carried out, removing dust, debris, and packaging materials.
  • Handover: The project culminates in a formal handover, where you’ll receive instructions for appliance operation, warranty information, and maintenance tips.

Additional Considerations for a Smooth Kitchen Installation

  • Coordination: Effective communication with each trade is vital. Confirm schedules and ensure everyone is aware of dependencies. For example, plumbing and electrical works need to be completed before plastering or flooring.
  • Access Arrangements: Make arrangements for easy access to your property and work areas. Ensure parking permits or designated parking spaces are available for tradespeople to prevent delays.
  • Utilities and Facilities: Provide access to W.C. and washing facilities, especially for multi-day or extensive works, to keep tradespeople comfortable and productive.
  • Project Timeline: While the estimated schedule provides an outline, be prepared for potential delays due to unforeseen circumstances, supply chain issues, or weather conditions. Flexibility is essential.

 

Summary

Having a new kitchen installed is a major home improvement project that involves multiple stages, each requiring specific skills and careful planning. A typical schedule includes:

  1. Design & Planning– Finalize design, place orders, and schedule trades
  2. Preparation– Remove existing kitchen, organise storage
  3. Utility Disconnection– Isolate gas, water, and electricity
  4. Wall & Ceiling Preparation– Marking, chasing, plastering
  5. Flooring & Surface Preparation– Laying bases and flooring
  6. Carcass Installation– Fit kitchen units
  7. Electrical & Plumbing Completion– Connect appliances, install circuits, pass wiring
  8. Worktop and Tiling– Measure, fabricate, install worktops and tiles
  9. Finishing Touches– Attach doors, drawers, hardware, connect appliances
  10. Final Checks & Snagging– Quality control and adjustments
  11. Clean-up & Handover– Leave your kitchen ready for use

Final Tips for a Successful Installation

  • Plan well in advance and communicate clearly with all tradespeople.
  • Allow flexibility in your schedule to account for unforeseen delays.
  • Be available for questions, but give tradespeople space to work efficiently.
  • Ensure all utilities are accessible and permits are in place.
  • Maintain a detailed record of correspondence, warranties, and instructions for future reference.

Investing in a well-organized approach ensures your new kitchen will be a beautiful, functional space that enhances your home for years to come. Proper planning, experienced professionals, and good communication are the keys to a successful kitchen installation.

 

 

 

 

 

Related Articles

The guys did a great job yesterday – and were very accommodating too (putting things back in cupboards that they had to remove.) I gave them regular coffee / tea (and my wife made them a couple of Apple buns too) – and last night I gave them each a bottle of VERY good wine as a small thank you. GW - Hildenborough

We have been very impressed by Bright Spark Electrical Services. Karen Smith visited us to discuss our requirements and gave advice which cut our costs. The work was carried quickly and on time with excellent results. The areas affected were clean and tidy when the work was completed. We had a slight problem with a unit but it was dealt with as soon as it was reported. I have no hesitation in recommending this company and will definitely contact them again for any further electrical problems.

Peter W, Paddock Wood

My external security lights had failed and because they were over 20 years old, several electricians felt unable to help me. I then asked Karen from Bright Sparks to get involved. She promptly surveyed the problem, gave me a competitive quote and as soon as I accepted it, gave me a firm date for the work to be undertaken. Her electricians arrived on the due date, were very friendly and tidy and worked in difficult places without problem. I definitely intend to use Bright Sparks again.

John, Pembury

I was really impressed with the work done for me by Bright Sparks. It is lovely that they are local to me in Hildenborough and grateful that they could fit me in at short notice. The repairs were done quickly and easily by Charlie and the whole thing coordinated by Karen who kept me informed every step of the way. Well done Bright Sparks!

Jill - Hildenborough

I’d like to say a huge thank you Karen, to you & your team for providing the excellent service you do. Always there when we have an issue or just routine work needs to be carried out. It’s so reassuring that we can rely on you at any time, even for advice. Always professional, knowledgeable & particularly personable Superb…

Kerry, Tunbridge Wells

REQUEST QUOTE